GRANITE & MARBLE
LAYING - METHODOLOGY
STORAGE OF GRANITE AND MARBLE
1. The
slabs/ tiles shall be stacked on edges on regular platforms under cover.
During unloading, care shall be exercised to avoid breakage.
2. Tiles of
different quality, size and thickness shall be stacked separately.
3. Within
the site, the tiles shall be transported on platform trolleys
RECOMMENDED TILE LAYING PROCEDURE
CHECKS PRIOR TO START OF WORK
CHECKS DURING EXECUTION OF WORK
POST-EXECUTION CHECKS
SKIRTING
COPING
TOOLS TO BE USED BY TRADESMEN
Required tools must be available at site to ensure correct
work. Basic tools of the tiling gang are:
1. Trowels
2. Line dori
3. Tube
levels
4. Plumb
bobs
5. Measurement
Tape
6. Spirit
levels 1-2m
7. Sand
sieve
8. Aluminium
straight edge
9. Right
angle
10. Chipping
Tools
11. Masons
hammer
12. Rubber
hammer
13. Leveling
threads
14. Tile cutter
15. Angle
grinder
16. Masons
brushes and buckets
17. Mortar
boxes
INSPECTION METHODOLOGY FOR QUALITY ASSURANCE
1. Check for
conformance of the tiled pattern and specifications to the approved drawings.
2. Check for
uniformity in line and level visually.
3. Check of
straightness of tiled surface. The fresh tiled surface should be of proper
level using a spirit level/ Aluminium straight edge or line dori.
4. Ensure
the cement and the sand have been checked/ tested prior to tiling.
5. Ensure
that the granite/ marble not is broken/ cracked and joints are well filled. In
case of cracks near the edges, these cracks to be filled using epoxy compound.
6. After
joint filing, ensure that joints are made even using an angle grinder.
7. Tap the
tiled surface to check for hollowness. The tiled surface should be covered with
POP and tarpaulin sheets to prevent damage to the tiled surface.
8. Ensure
while fixing of granite doorjambs, proper packing with cement paste throughout
the entire contact surface of the granite slab and blockwork. This surface
should be 900 to the floor.
9. During
fixing of windowsills, ensure that the concerned mason immediately removes
extra cement slurry/ dripping.
10. Ensure
chamfering of skirting is as per specifications.
11. Treads and
risers to be of uniform dimension and thickness.
TOOLS TO BE USED FOR QUALITY INSPECTION
1. Plumb
bobs
2. Spirit
levels 1-2m
3. Aluminium
straight edge
4. Measuring
Tape
5. Approved
“Good for Construction” Drawings